Gateway 2 | ±226,800 square feet

UNDER CONSTRUCTION | DELIVERING Q2 2027

The Gateway 2 building will feature a 195’ deep shared truck court, 18 dock-high doors (expandable up to 76 doors), two drive-in doors, 50-foot by 54-foot bays, 32-foot clear heights, ESFR fire protection and LED lighting.

BASE Building Specifications

BASE BUILDING SHELL

Building size

Available SF

226,800 SF

±34,020 - ±226,800 SF

Building dimensions

1,080’ x 210’

Construction

Tilt concrete panel

Clear height

32’ clear height

Typical bay spacing

54’ x 50’

Dock (speed bay) spacing

60’ deep

Car parking

~231 parking spots

WALLS

Tilt-up concrete wall panels

EQUIPMENT

7’ x 8’ 40,000 lb. capacity mechanical dock levelers (pit) at dock-high OH doors

floors

6” non-reinforced sealed concrete

Rack loading up to 10,000 lb. Point loading on 6” x 6” base plate

Sealed with penetrating hardener

Floor joints filled with joint filler

ROOF

45mil white TPO roof

TRUCK COURT

Truck loading dock

195’ deep shared truck court

Dock doors

(18) 9’ x 10’ dock high doors
Expandable up to 76 doors

Drive-in doors

Two (2) (12’ x 14’) drive-in doors

water & SEWER

Sanitary sewer lines

6” sanitary sewer 30’ from the inside face of the front of the building

Domestic water line

3” domestic water service including multiple 2” future services stubbed into building

electrical, lighting & heating

Electrical

House service including 480/277v 3-phase power and 120/208v single-phase power
Service conduits from transformer stubbed into building

Lighting

LED high bay fixtures with motion sensors

Ventilation

1 air change per hour

Heating

Unit heaters for freeze protection of ESFR system only

FIRE PROTECTION

ESFR fire suppression system with fire pump

CONSTRUCTION PHOTOS

September 2026 | Magnus Development Partners broke ground on Gateway 2 in August, and sitework is underway. The building will deliver in Q2 2027.